The Project for Urgent Replacement of Bridges in Flood-Prone Areas Prey Veng province (Ba Baong No 2)

  




Project nameThe Project for Urgent Replacement of Bridges in Flood-Prone Areas
AreaCambodia
SeasonJul., 2018 ~ Nov., 2020
FieldRoads, Bridges and Transport
The project area is a trunk road located in the flood plain on the left bank of the Mekong River, therefore, it also plays an important role as a detour route when National Highway 1 is blocked by floods and other disasters. In this way, this road reduce the vulnerability of the transportation network to natural disasters. However, despite the fact that the seven temporary bridges to be supported by this project are vulnerable to flooding, the maintenance of the roads and bridges has been delayed because they are located in rural areas. By improving these seven bridges, safe and smooth traffic and logistics can be ensured.



PEAM TE PROJECT

Work Description   :  New Bridge Construction, Road and Approach Road Construction, Slope Protection            Work, Riverbed Work, Gabion Work.
Location                :  Kratie province
Client                     :  MPWT
Main Contractor    :   HAZAMA ANDO CORPORATION








Country, SitePrey Veng province and Kratie province, Cambodia
Project OutlineThe objective of the Project is to secure the safe, stable and smooth transportation in flood-prone areas by the replacement of temporary bridges on National Road No.11 and No.73.
CategoryB
Reason of
Categorization
The project is not considered to be a large-scale Bridge project, is not located in a sensitive area, and has none of the sensitive characteristics under the JICA guidelines for environmental and social considerations(April 2010), it is not likely to have a significant adverse impact on the environment.
Latest Result of
Monitoring
-
Past Results of
Monitoring
-
Remarks-














































إرسال تعليق