CHROY CHANGWAR BRIDGE
Location : Phnom Penh
Works Description : New Approach Bridge Construction, Pier Repair, Bridge Renovation Construction.
Client : MPWT,
Main Contractor : OBAYASHI CORPORATION
Country, Site | Phnom Penh, Cambodia |
---|---|
Project Outline | The objective of the Project is to enhance transport capacity on National Road No. 6A by the rehabilitation of the Chroy Changwar Bridge, which connects Phnom Penh with Chroy Changwar, on National Road No. 6A. |
Category | B |
Reason of Categorization | The project is not considered to be a large-scale Bridge project, is not located in a sensitive area, and has none of the sensitive characteristics under the JICA guidelines for environmental and social considerations(April 2010), it is not likely to have a significant adverse impact on the environment. |
Latest Result of Monitoring | - |
Past Results of Monitoring | - |
Remarks |
Concrete beam bridge, including its embankments, is 971 metres long and comprised of three main sections. The roadway embankments at either end extend a total of 258 metres, while the approach slabs cover 168 metres and the main span over the river is 545 metres long.